Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High temperature mold PPSU material – Suntime

Short Description:


Detail

Product Tags

Related Video

Feedback (2)

With our abundant experience and considerate products and services, we have been recognized to be a reputable supplier for a lot of global consumers for Affordable Price Die Cast Mold Making Suppliers , Telecommunications Prototype Tooling , Die Cast Mold Makers , We welcome new and old customers from all walks of life to contact us for future business relationships and achieve mutual success!
Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High temperature mold PPSU material – Suntime Detail:

The high temperature auto unscrewing project has mold temperature of 160 degree and resin temperature of 380 degree. This 4 cavity mold has cycle time of 39 seconds, and very smooth unscrewing movement. Part is high tolerance with less than +/-0.02mm. Parts are used in deep sea water system devices.

Appliance and Type Water system products auto unscrewing 4 cavity mould, PPSU material, high temperature mold
Part name MINI PISTON
Resin PPSU
No. of cavity 1*4
Mould Base LKM S50C
Steel of cavity&Core H-13 HRC48-50 /H-13 HRC48-50
Tool weight 430KG
Tool size 493X454X440
Press Ton 120T
Mold life 800000
Injection system Cold runner mould
Cooling system 160 ℃
Ejection System unscrewing by motor and gear wheel
Special points mold temperature 160 ℃,material temperature 380℃。
Difficulties unscrewing very smooth, cycle time 39′S,tolerance +/-0.02mm.
Lead time 5 weeks
Package Anti-rust Paper and film, little anti-rust oil and plywood box
Packing items Certification of steel, final 2D & 3D tool design, hot runner document, spare parts and electrodes…
Shrinkage 1.007
Surface finish B-2
Trade terms FOB Shenzhen
Export to Australia

We have made many tools for this customer. Our designers work very effective, for DFM, it can be finished within 1~2 days, 2D layout within 2~4 days, and 3D within 3~5 days depending on mold complexity. When time is very urgent, we normally make 3D drawing directly after DFM, but of course, it must be based on customers’ approval.

1

Design feedback

2

3D mold design

3

3D mold design

1633433780782

3D mold design

The injection mould tool is auto-unscrewing by motor and gear wheel. There are many insulation plates in mould four sides as the mold temperature is very high. This 4 cavity mold has moulding cycle time 39 seconds and the part tolerance is less than +/-0.02mm.

20190225142127-min
5-ppsu-mould-suntime-min
20190225142103-min
4-ppsu-high-temperature-mold-min

1. How is the mold temperature for this PPSU mold?
The mold temperature is 160~180 degree.

2.How about the tolerance for parts made in Suntime Precision Mould?
Mold: +_0.01mm, Plastic Part: +_0.02mm and Machining product: +_0.005mm.

3. What production material you usually use?
For plastic injection molding, resin includes PPSU, PEEK, ABS, PC, PC+ABS, PMMA, PP, HIPS, PE(HDPE,MDPE,LDPE). PA12, PA66, PA66+Glass fiber,TPE,TPR,TPU, PPSU, LCP, POM, PVDF, PET, PBT… And for die casting, the aluminum material is A380,A356,6061.

4. What is your design lead time?
“DFM: Normally Within 2 working day.
2D mold layout: Normally Within 3-4 working day.
3D mold drawing: Normally Within 4-5 working day.”

5. What regions is Suntime located?
Our factory is located in Chang An town of Dong Guan City in south of China, which is initial mold manufacturing place. 10 minutes to Shen Zhen. 30 minutes to Shen Zhen airport.

6. How’s your Communication skill?
“a). Rich experienced sales and engineers follow project and communicate in skilled English.
b). 24/7 style service.   One to one project management.
c). Come to visit anytime and Suntime team visit customers yearly.   
d). weekly report every Monday. (2 reports a week if needed).  
e). Any emails reply within 24 hours, you can call us anytime, even in middle night. “


Product detail pictures:

Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High  temperature mold PPSU material – Suntime detail pictures

Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High  temperature mold PPSU material – Suntime detail pictures

Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High  temperature mold PPSU material – Suntime detail pictures

Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High  temperature mold PPSU material – Suntime detail pictures


Related Product Guide:

With a positive and progressive attitude to customer's interest, our enterprise continually improves our products excellent to meet the wants of customers and further focuses on safety, reliability, environmental requirements, and innovation of Plastic Pipe Fitting Precision Mold And Tooling For Building And Construction – Auto unscrewing mould making & High temperature mold PPSU material – Suntime, The product will supply to all over the world, such as: Luxemburg, Paraguay, Afghanistan, Our factory insists on the principle of "Quality First, Sustainable Development", and takes "Honest Business, Mutual Benefits" as our developable goal. All members sincerely thanks for all old and new customers' support. We will keep working hard and offering you the highest-quality products and service.Thanks.
  • The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Christine from Slovakia - 2018.06.12 16:22
    We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By James Brown from Moldova - 2018.09.29 17:23